May , 2025
12 Off CM Lodestar Electric Hoists Reaches New Heights in Roof Replacement Project
Hoist & Winch Ltd provided a comprehensive lifting solution for the complex replacement of the tensile roof covering on a landmark building at Nottingham University's Castle Meadow Campus, a former HMRC complex resembling London's O2 Arena. Tasked by the specialist subcontractor, Hoist & Winch supplied 12 x CM Lodestar electric chain hoists, bespoke control stations, and a number of large capacity William Hackett lever hoists to safely lower the old roof and raise the new one. Their technical consultancy covered crucial aspects like legislation, planning, and equipment selection, ensuring a smooth and successful operation. The subcontractor was highly satisfied, leading to further collaborations and leveraging the acquired knowledge for a similar project in Copenhagen.
Hire of 8 Off JDN Air Hoists for Powered Pontoon
Reinforcing the piers that support a major UK rail viaduct spanning a river estuary is no easy task, which is exactly why the specialist marine subcontractor appointed to undertake this project approached Hoist & Winch Ltd for the optimal lifting solution, utilising 8 x JDN Air Hoists.
More Ceiling Mounted Lifting Beams and Ultra Low Manual Hoists For UK Construction Projects
For a complex London construction project, Hoist & Winch Ltd provided a complete lifting solution, overcoming tight headroom challenges to install heavy energy plant in a basement. They supplied and installed 2 Off Ceiling Mounted hoist runway beams and Ultra low-headroom manual hoists and Trolleys, ensuring safe and efficient operations, including installation, testing and documentation.